Meeting overview
-
Hall sensor placement in aperture
-
Measurement planning
-
Hall sensor in tunnel?
-
When sextupole and octupole magnet access?
-
Simulations and training on them in progress with Jiles-Atherton model for hysteresis.
Outcome
New holec needs to be evaluated to work for the dipoles (ramp rate etc.)
EPA community meeting presentation on hysteresis, experiment design, etc…
Vacuum chamber is impossible to procure in time.
Action
- Introduce Mauros to hysteresis-simulator and waveform design packages. [propriority:: medium] [completion:: 2024-07-03]
- Fix all waveform design packages for distribution to Mauros. [priority:: medium] [completion:: 2024-06-13]
Packages have been fixed at the request of Vincenzo.
- Send new waveforms for dipoles to be measured. [priority:: highest] [due:: 2024-07-04] [completion:: 2024-08-21]
- Refactor Waveform Builder to be more clear in structure with generation scripts. [completion:: 2024-07-29]
2024-08-21
Waveforms have been sent, measurements have been done on MBI cycles, however there are limitations in the HOLEC for operational cycle sequences.