Overview

Hysteresis compensation on SFT flat top without dipoles pulsing on MD1. This requires the SFT injection to be set up for the lack of precycle

Other measurements

  • Beam tune at SFT flat top without compensating quadrupole hysteresis , but after manually correcting dipole field w.r.t. B-Train during supercycle transitions with Q20 and Q26 LHCPILOT to validate Quadrupole measurements.
    • Start with 3x SFT, then switch to SFT + LHC, stay 10 cycles to stabilize hysteresis, take 10 measurements on tune, then switch back to SFT, stay 10 cycles to stabilize, then take measurements.
  • B-Train measurements on 26 GeV injection plateau without MD1.
    • Take a 6 BP parallel MD cycle, set the main dipole current to 26 GeV equivalent across the full cycle, so without ramping to 200 GeV. Quadrupoles are allowed to ramp.
    • Configure a supercycle SFT + SFT + MD and do measurements. By having beam on the SFT cycles we can also validate our eddy current parameter fits in post.
    • This is a “wishful thinking” SSC configuration if we do not have a precycle.
    • If possible, re-do with 14 GeV equivalent cycle.

MD Preparation

Models to use

Suggested models:

MD Setup

MD Execution

Log

Logbook entries

https://logbook.cern.ch/elogbook-server/GET/showEventInLogbook/4363209