category: literaturenote tags: Accelerator Physics, mc6-beam-instrumentation-controls-feedback-and-operational-aspects - MC6: Beam Instrumentation, Controls, Feedback and Operational Aspects, mc6-t04-accelerator-storage-ring-control-systems - MC6.T04: Accelerator/Storage Ring Control Systems citekey: albrightFirstOperationalResults2023 status: unread dateread:
Cite
[1]
S. Albright et al., “First operational results of new real-time magnetic measurement systems for accelerator control,” Proc. IPAC’23, Venice, Italy, pp. 3996-3999 pages, Sep. 2023, doi: 10.18429/JACOW-IPAC2023-THPA024.
LINK
.
Synth
Contribution::
Related::
Md
FirstAuthor:: Albright, Simon
Author:: Giloteaux, David
Author:: Damerau, Heiko
Author:: Huschauer, Alexander
Author:: Di Capua, Vincenzo
Author:: Buzio, Marco
Author:: Bonora, Matthias
Author:: Di Giovanni, Gian Piero
~
Title:: First operational results of new real-time magnetic measurement systems for accelerator control
Year:: 2023
Citekey:: albrightFirstOperationalResults2023
itemType:: journalArticle
Journal:: Proc. IPAC’23, Venice, Italy
Pages:: 3996-3999 pages
DOI:: 10.18429/JACOW-IPAC2023-THPA024
Abstract
A new real-time measurement system for accelerator control, named FIRESTORM (Field In Real-time Streaming from Online Reference Magnets), to measure the integrated bending field has been recently deployed and commissioned in six synchrotron rings at CERN. We present the operational experience during the preparation phase and the restart of the accelerator complex for Run 3, focusing on the metrological performance of the new sensors and electronics, and on the lessons learned during commissioning. We also discuss the prospects for the evolution of the system and its adaptation to related use cases. .
Notes
.