- Use voltage of coil for learning and prediction
- Get voltage of coil in B-Train from FGC in progress by TM
- Study what happens when we do ΔB=2e−4T at flattop on the next FB (basically using the “wrong” true field when predicting).
- This can be investigated in the lab without pulsed measuremends
- Need to synchronize measurements and script them if we want to measured 17 times each sequence
- Vincenzo will see if we can mark on MD1 ramp-down by hacking B-train
- Verify the calibration of the HOLEC if we can reduce the difference between programmed and measured current
- Need to define pre-cycle cycle for QF
- No water in 867 mid - november - 3rd week January.
- Dipole measurements finished before YETS, initial quad measurements with new bench
- Write FESA class for 2024-10-14 - FGC Real-time channel correction
- Show what we need to do on EPA presentation